115 kV Substation
Niagara Falls, New York

Project:  115 kV Substation
Features:  Detail Design and Startup Services

Summary of Scope of Service

115 KV SubstationATSI provided engineering for the installation of a new 115 kV substation for an existing 50 MW cogeneration facility. Modified existing plant 13.8 kV switchgear to allow connection of substation to the facility. Provided expansion for a concurrent plant project to allow for ease of future installation.

Services Provided

  • Single-line drawings
  • Load flow and short circuit analysis
  • Protective relay selection, setting and coordination studies
  • Power transformer specification
  • SF6 circuit breaker specification
  • Substation specification
  • Underground duct bank design
  • Foundation design
  • Electrical installation drawings
  • Plant metering cabinet design
  • Switchgear modification drawings
  • High voltage equipment witness testing
  • Construction assistance
  • Startup assistance
  • Utility coordination
  • Utility RTU installation drawings

Electrical Power System Study
Henderson, Nevada

Project:  Electrical Power System Study
Features:  Power System Study

Summary of Scope of Service

115 KV Substation ATSI was requested to provide a detailed study of the electrical failures at the facility. The client is responsible for maintaining and operating the 15 kV and 5 kV distribution systems associated with a 230 kV/15.0 kV electrical substation. Three separate industrial clients are served by their power distribution system.

Services Provided

  • Power system curtailment and outage analysis
  • Electrical system survey and evaluation
  • Recommendations for system operation and configuration
  • Maintenance and testing schedules for electrical equipment
  • Spare parts recommendations
  • Operation/maintenance manpower recommendations

Power Distribution Maintenance Program
Oswego, New York

Project:  Power Distribution Maintenance Program
Features:  Development of Power Distribution Maintenance Program

Summary of Scope of Service

ATSI was selected to develop an electrical power distribution maintenance program for the 115 kV and 13.8 kV distribution systems. Areas of the facility included the 115 kV switchyard, 115 kV transformer yard and the hot and cold mill area.

Services Provided

  • Walkdown of equipment
  • Developed master equipment list
  • Equipment preventive maintenance schedule
  • Budgetary cost estimates of maintenance program
  • Created equipment inspection reports